Read the project context without guessing at the roof
Commercial projects near the airport, corporate center, and Southgate can differ in use, occupancy, and construction stage. The owner confirms the property's use, occupancy and current work stage; available records and field inspection establish the roof assembly before a repair proposal is prepared. If construction is underway, ask which contractor owns new penetrations, who will reset equipment, and when the roofing surface will be ready for a permanent tie-in.
Where a project involves several buildings, identify each roof separately. A roof plan should distinguish the building footprint, access point, drainage zones, equipment curbs, and expansion joints. If the owner has only a floor plan, mark the roof observations on photographs and carry those references into the estimate. Our Garland service area is nearby, and each property's history and roof condition receive their own inspection record.